• Tentang
    • Bima Shabartum Group
      • PT Bima Shabartum Gemilang
      • PT Bima Shabartum Wijaya
      • PT Arrahman Mitra Kontraktor
    • Team Kami
    • Visi & Misi
  • Layanan
    • Konsultan Tambang
      • Dokumen Persetujuan Tambang
        • Dokumen Studi Kelayakan dan Revisi
        • Dokumen RKAB (Eksplorasi & Produksi)
        • Dokumen Rencana Reklamasi (RR)
        • Dokumen Pasca Tambang (RPT)
      • RIPPM
    • Drilling (Mining & Construction)
      • Exploration Drilling Service
      • Hidrology Drilling Service
      • Geotechnic Drilling Service
      • Standar Penetration Test (SPT) Service
      • Cone Penetration Test (CPT) Service
    • Drilling Equipment
      • Jacro 200
      • Sondir dan SPT
    • Survey and Mapping
      • Pengukuran Benchmark
      • Pemasangan Tanda Batas WIUP
      • Geological Mapping
      • LiDAR Survey
      • Bathimetri Survey
      • Topography Survey
    • Survey and Mapping Equipment
      • Total Station CTS-112R4
      • CORS CGI-610 GNSS/INS SENSOR
      • GNSS Geomate SG7
      • USV Apache 3
    • Geophysical Acquisition
      • Geophysical Logging
      • Geolistrik
    • Konsultan Lingkungan
      • Jasa Konsultan Lingkungan
        • Addendum ANDAL & RKL-RPL
        • Dokumen Evaluasi Lingkungan Hidup (DELH)
        • Dokumen Pengelolaan Lingkungan Hidup (DPLH)
        • Formulir UKL-UPL
        • Persetujuan Teknis Baku Mutu Air Limbah BMAL
        • Persetujuan Teknis Baku Mutu Emisi
        • Rincian Teknis Limbah B3
        • Laporan Pelaksanaan RKL-RPL
        • Laporan Triwulan Perlindungan dan Pengelolaan Lingkungan Hidup
      • Pengujian Lapangan
        • Pengambilan Data Flora dan Fauna (Transect)
        • Pengambilan Data Sosial Budaya & Ekonomi
        • Pengambilan Data Kesehatan Masyarakat
        • Pengambilan Data Radiasi Elektromagnetik (SUTT/SUTET)
      • Pengujian Laboratium
        • Pengujian Laboratorium Sampel Air Parameter Fisik, Kimia dan Biologi (Air Permukaan & Air Limbah)
        • Pengujian Laboratorium Sampel Udara (Ambien)
        • Pengujian Laboratorium Sampe Emisi
        • Pengujian Laboratorium Biota Air
        • Pengujian Jar Test (Penentuan Volume Koagulan)
    • Konstruksi dan Kontraktor
      • Pekerjaan Lansekap atau Pertamanan
      • Pekerjaan Penyiapan dan Pematangan Tanah atau Lokasi
      • Pekerjaan Pengeboran Sumur Air Tanah Dalam
      • Proyek Konsultasi Arsitektural Bangunan
      • Pekerjaan Persiapan Lapangan Untuk Pertambangan
      • Proyek Konsultasi Interior Bangunan
      • Proyek Pelaksanaan Arsitektur
      • Proyek Pelaksanaan Interior Bangunan
    • BGM Lab
      • Soil and Rock Test
      • Hydrology Project
  • Informasi
    • Karir
  • Kontak Kami
  • Sibima
    • Sibima Series
    • Sibima TnD
    • Sibisha
Menu
  • Tentang
    • Bima Shabartum Group
      • PT Bima Shabartum Gemilang
      • PT Bima Shabartum Wijaya
      • PT Arrahman Mitra Kontraktor
    • Team Kami
    • Visi & Misi
  • Layanan
    • Konsultan Tambang
      • Dokumen Persetujuan Tambang
        • Dokumen Studi Kelayakan dan Revisi
        • Dokumen RKAB (Eksplorasi & Produksi)
        • Dokumen Rencana Reklamasi (RR)
        • Dokumen Pasca Tambang (RPT)
      • RIPPM
    • Drilling (Mining & Construction)
      • Exploration Drilling Service
      • Hidrology Drilling Service
      • Geotechnic Drilling Service
      • Standar Penetration Test (SPT) Service
      • Cone Penetration Test (CPT) Service
    • Drilling Equipment
      • Jacro 200
      • Sondir dan SPT
    • Survey and Mapping
      • Pengukuran Benchmark
      • Pemasangan Tanda Batas WIUP
      • Geological Mapping
      • LiDAR Survey
      • Bathimetri Survey
      • Topography Survey
    • Survey and Mapping Equipment
      • Total Station CTS-112R4
      • CORS CGI-610 GNSS/INS SENSOR
      • GNSS Geomate SG7
      • USV Apache 3
    • Geophysical Acquisition
      • Geophysical Logging
      • Geolistrik
    • Konsultan Lingkungan
      • Jasa Konsultan Lingkungan
        • Addendum ANDAL & RKL-RPL
        • Dokumen Evaluasi Lingkungan Hidup (DELH)
        • Dokumen Pengelolaan Lingkungan Hidup (DPLH)
        • Formulir UKL-UPL
        • Persetujuan Teknis Baku Mutu Air Limbah BMAL
        • Persetujuan Teknis Baku Mutu Emisi
        • Rincian Teknis Limbah B3
        • Laporan Pelaksanaan RKL-RPL
        • Laporan Triwulan Perlindungan dan Pengelolaan Lingkungan Hidup
      • Pengujian Lapangan
        • Pengambilan Data Flora dan Fauna (Transect)
        • Pengambilan Data Sosial Budaya & Ekonomi
        • Pengambilan Data Kesehatan Masyarakat
        • Pengambilan Data Radiasi Elektromagnetik (SUTT/SUTET)
      • Pengujian Laboratium
        • Pengujian Laboratorium Sampel Air Parameter Fisik, Kimia dan Biologi (Air Permukaan & Air Limbah)
        • Pengujian Laboratorium Sampel Udara (Ambien)
        • Pengujian Laboratorium Sampe Emisi
        • Pengujian Laboratorium Biota Air
        • Pengujian Jar Test (Penentuan Volume Koagulan)
    • Konstruksi dan Kontraktor
      • Pekerjaan Lansekap atau Pertamanan
      • Pekerjaan Penyiapan dan Pematangan Tanah atau Lokasi
      • Pekerjaan Pengeboran Sumur Air Tanah Dalam
      • Proyek Konsultasi Arsitektural Bangunan
      • Pekerjaan Persiapan Lapangan Untuk Pertambangan
      • Proyek Konsultasi Interior Bangunan
      • Proyek Pelaksanaan Arsitektur
      • Proyek Pelaksanaan Interior Bangunan
    • BGM Lab
      • Soil and Rock Test
      • Hydrology Project
  • Informasi
    • Karir
  • Kontak Kami
  • Sibima
    • Sibima Series
    • Sibima TnD
    • Sibisha
Hubungi Kami

Home » Informasi

Informasi

Harga Tembaga Tembus Rekor Baru: Megatren Infrastruktur AI Buka Peluang Emas bagi Pemegang IUP!

Harga Tembaga Tembus Rekor Baru

May 1, 2026
by Administrator
Alarm Bahaya APNI: Cadangan Saprolit Menipis, Momentum Tambang Nikel Wajib Beralih ke Limonit & HPAL

Cadangan Saprolit Menipis Momentum Tambang Nikel

April 30, 2026
by Administrator
kalender compliance tambang 2026 5

Megatren AI dan Krisis Geopolitik

April 30, 2026
by Administrator
Sistem RKAB 2026 Resmi Dikunci: Sanksi Setop Operasi Setahun Mulai Dijatuhkan, Status IUP Anda Aman?

Sistem RKAB 2026 Resmi Dikunci

April 29, 2026
by Administrator
kalender compliance tambang 2026 5

Hilirisasi Tambang Bukan Lagi Pilihan, Melainkan Syarat Bertahan Hidup

April 29, 2026
by Administrator
Babak Baru Logistik Sumsel: Uji Coba 1.125 Gerbong KAI Dimulai, Sudah Siapkah Infrastruktur Loading Tambang Anda

Uji Coba 1.125 Gerbong KAI Dimulai

April 28, 2026
by Administrator
LOAD MORE
LOADING
footer logo

Jl. Mayor Zurbi Bustan, Saninage Asri
No. A2, Sukarami, Palembang 30151

0711-411407

admin.palembang@bimashabartum.co.id

+62 82374722113

Useful links

  • Tentang Kami
  • Team Kami
  • Layanan
  • Informasi
  • Karir

Our Program

  • Sibisha
  • Sibima TnD
  • Sibima Series
© 2026 Bima Shabartum Group. Admin & IT
Shopping Basket
Hubungi Kami Disini!